| HEBM Bamboo Soffit |
||
Raw Material |
4-6 years moso bamboo | |
| Colors | Dark Coffee ![]() |
Teak color ![]() |
| Size | L1850XW100X12mm L2000XW100X12mm L2440XW100X12mm |
|
| Profile |
Shiplap ![]() T&G at heads ![]() |
|
| Finish |
Water-based Oil (brand-Woca) Water-based Coating Unfinished |
|
| Moisture Content |
8-12% (Surface value) | |
| Density |
+/-1150g/cm3 | |
| Installation |
Clips Hidden Clips | |
| Life Span |
25 years | |


HEBM & Bamboo Ceiling Soffit
1. Ensure the suffix clip is positioned level with the surface.
2. For the first pc of soffit board, utilize starter clips. Employ one screw per starter clip.
3. For following boards, utilize suffix clips. Secure the joint and clips by driving the fastener. Apply two screws per field clip associated with suffix boards.
4. Employ approximately 27 fasteners per square meter. Each joint requires the use of clips.
5. For installations exposed to salt air, proximity to significant bodies of water, swimming pools, or other areas prone to corrosion, Grade 316 stainless steel screws are mandatory.




